Skip to main content
background

EPOLIS WE 300

Epoxy water-dispersion coating

Application:

  • For coat mattifying floors made of epoxy resins
  • For protecting mineral substrates

Properties:

  • Easy application
  • Has very good adhesion to concrete
  • High resistance to abrasion
  • Increases the chemical resistance of substrates
  • Vapour-permeable
  • Meets high hygiene standards
  • Solvent-free and water-dilutable
  • Enables obtaining a surface that is durable, aesthetically pleasing and easy to clean
  • It can be applied on damp substrates (with a max. moisture content of 10%)

Available packaging:

  • 5 kg

Composition

epoxy resin, water, hardener, filler, mattifying agent, additives

Density

  • component A - 1,26 g/cm³
  • component B - 1,14 g/cm³

Mixing ratio 

1 : 0,20 by weight (component A : component B)

Open time

  • at +10°C - 2 h
  • at +20°C - 30 mins
  • at +25°C - 20 mins

Abrasion resistance

< 3000 mg

Capillary absorption and permeability to water

< 0,1 kg/m² × h⁰,

Resistance to impact

class 1

Adhesion strength by pull off test

≥ 2,0 (1,5)a N/mm²
aThe value in brackets is the lowest accepted value of any reading.

Reaction to fire

Bfl-s1

Pedestrian traffic load

  • at +10°C - after 4 days
  • at +20°C - after 2 days
  • at +25°C - after 1 day

Full load

  • at +10°C - after 10 days
  • at +20°C - after 7 days
  • at +25°C - after 4 days

Application temperature

from +10°C to +27°C

Reference document(s)

EN 1504-2:2004

  • The works should be carried out at an ambient temperature from +10°C to +27°C, with a maximum relative humidity of 70%. Higher temperature and humidity will accelerate the setting time of the mixture. At lower temperatures, a delay in setting is to be expected, as well as a change in the consistency of the material and as a result of that an increase in consumption.
    Failure to provide adequate conditions for the work may result in uneven mattifying of the floor and, in the case of slower bonding time, the formation of permanent surface staining.
    The temperature of the substrate and the uncured flooring must always be at least 3°C above the dew point temperature, from the commencement of work until the material is fully cured.
    The premises where the work takes place must be sectioned off, protected from unauthorised access and a safety zone must be maintained against the use of open flames, particularly before conducting welding work. During the works, very good ventilation of the work area should be ensured.

  • 0,15 ÷ 0,3 kg/m2 per layer

See also

NEXLER EPOLIS WE 200_PL_320px

EPOLIS WE 200

Epoxy water dispersion paint

Find out more SYSTEM
NEXLER EPOLIS WE 100_EN_320px

EPOLIS WE 100

Water-dilutable epoxy primer

Find out more SYSTEM

Documents for download

icon Declaration of Performance

icon Safety Data Sheet component A

icon Safety Data Sheet component B

icon Technical Data Sheet

Search for a document

Archival documents

Type of document
Year
Month